Pictures From Jan-Jul 2023 - It's All About Having Fun!!

Sunday, February 22, 2015

2-21 Getting Ready


We're going on a trip for ten days at the end of week so we needed to get the Minnie ready. The first project we did was to fix a couple of items the dining table and the bathroom counter top. During one of our trips something fell out of the cabinet above it and put a hole in the middle of the table so the laminate needed to be replaced. The counter in the bathroom got wet and the board was ruined so the whole counter needed to be rebuilt. Larry was going to do this project himself so off we went to track down some laminate. We found some at The Home Depot but we had to buy a full sheet and we only needed a little bit. Next stop was Lowe's they didn't have any laminate. Then we stopped at McCoy they didn't sell any but they recommended Surface Source. So off to Surface Source we went. After talking to Alan and finding a laminate we liked Larry decided it would be easier if Surface Source did the work. While the table and counter was being worked on Larry reworked the sink covers in the kitchen. This took a couple of days because he had to put two coats of stain on them. We picked up the table and counter top yesterday and reinstalled them today. Surface Source did a great job and the color of the laminate was the same color as the old laminate.

Larry removing the bathroom sink from the counter.
Larry putting the faucet back on the sink.
The table with its new sleeve on
What the bathroom counter looks like after Larry reinstalled it.
   

No comments:

Post a Comment

I would love to hear friendly comments on anything at all. Ruth